Correspondence concerning the completion and dedication of the Tower. 1963 - 1968
Includes:
Proposal by Sir Edward Maufe for the statue of St Augustine. May 1963
Report on the features of the Tower preparatory to the planned dedication. 26 April 1963
Dean and Chapter acknowledge responsibility for the completed Tower on 2 September 1963
Legal advice based on a surveyor’s visit is that the public be denied access to the Tower and doors bee hung in the South Gallery to close the access staircase. January 1964
Discussion about design and cost of doors or gates to be installed. 1964
Consideration of the bell chamber, the ringing chamber and accommodation for the bellringers1964 – 1966
Letter from the Diocesan Guild of Church Bell Ringers commenting on the experience of visiting ringers and noting problems with excessive noise and with rainfall entering the tower. 17 January 1967
Correspondence concerning work carried out on the bell chamber and ringing chamber, including tot the floor covering. Includes some architect’s drawings May 1967 – January 1968